SWMS bundles or individual documents: choosing what you need
Choose individual documents for the activities you need now. Compare a bundle when you regularly need several of its listed documents. Check every inclusion and count shared documents once before comparing the current prices.

Make a work list before comparing prices
Write down the tasks and equipment used by your business, including access, deliveries and supporting activities. Separate regular work from occasional work. Match each activity with the product’s work covered and public sample.
A trade bundle is a set of separate documents. Its trade name is a browsing aid, not a promise that every possible job for that trade is included. A builder requesting one suitable SWMS does not necessarily need a whole catalogue.
A real comparison: carpentry and work at height
The Carpentry Bundle has eight documents: Deliveries to Site, General Carpentry, Installation of Joinery, Installation of Roofing, Manual Handling, Temporary Handrail Installation, Timber Framing (Floors, Walls and Roofs), and Work at Height.
The Work at Height Bundle has five: Deliveries to Site, Manual Handling, Temporary Handrail Installation, Use of Harness, and Work at Height.
Those bundles share four documents. Buying both provides nine distinct document titles, not thirteen. The Work at Height Bundle does not include Use of Scissor Lift; check that product separately if the work needs it. Compare the bundles with individual documents before deciding.
A second catalogue example: the Crane Bundle and Crane Operations Bundle currently contain the same 14 documents. Buying both for the same business does not add a document title.
Swipe or scroll the table to see all columns.
| Your activity list | What to compare |
|---|---|
| One scissor lift task | The Use of Scissor Lift document and any separate task-specific needs. |
| Several listed carpentry activities | The eight Carpentry Bundle inclusions against the individual documents you need. |
| Carpentry plus harness work | The Carpentry Bundle plus the individual Use of Harness document, as well as the overlapping bundle option. |
| A broad range of SWMS activities | The All SWMS Bundle inclusions; check forms, registers and the plan separately. |
Use a simple comparison sheet
The All SWMS Bundle contains the 84 SWMS listed on its product page. It does not include the separate safety forms, registers or subcontractor WHSE plan. The shop has 131 products in total, including its 19 bundles. Prices are maintained on the product pages; use those current figures rather than an old saved quote.
- List the exact product titles needed for your actual activities.
- Mark which titles each candidate bundle contains.
- Count each title once, and check documents your business already owns for the required jurisdiction.
- Compare the displayed AUD prices for the useful combinations. Review the complete total at checkout.
- Check any missing task, plant, jurisdiction or specialist requirements before ordering.
What happens after purchase?
Select the state or territory where the work takes place and complete checkout. Once payment is confirmed, the order page and your account provide protected document access. You do not need an email link to retrieve the purchase.
A bundle provides separate documents that can be downloaded individually or together as a ZIP. Use Complete & download beside each document to enter that job’s details. The ZIP supplies the originals with company details; it does not gather the individual job edits made in those forms.
Download and retain each completed job copy before leaving its form. Keep linked continuation pages with it. The licence covers the purchasing business across its own sites, with review and completion for each job; separate businesses need their own licences.
Buying the set is the start of the job preparation
Coordinate the documents used together so they describe compatible controls. For example, the delivery method should not send plant through the access area another document expects to keep clear. SafeWork NSW allows one SWMS to cover multiple high-risk activities or separate SWMS, with attention to how the activities interact.
Open the bundle catalogue, compare the listed contents and inspect individual samples. Then use how to fill out a SWMS and the download instructions to prepare the job copies. More documents do not establish that the site controls are in place.
Official reference: SafeWork NSW — coordinating multiple high-risk activities ↗
General document guidance from SiteWork Safety. Assess the actual work, implement the controls and check the local requirements. State requirements and source-based document review.


