State source review dated 3 October 2026. This page records the SWMS framework and material jurisdiction differences used in these documents. It is not a certificate of compliance. The full NSW Regulation 2025, current from 3 July 2026, was reviewed on 4 October 2026. Incorporated Australian Standards were not independently inspected.
The documents have had a source-based desk review. The document-by-state review maps local provisions to task controls, form fields and required specialist records. Purchased downloads include the selected state instructions. This is an AI desk review, not professional certification or government approval. The 6 October presentation follow-up adds Manual Handling exposure prompts, clearer layouts and protected samples. It does not verify unread Standards clauses. Each job still needs its actual controls, competent inspections, required design approvals and worker consultation.
Choose where the work takes place
New South Wales
Work Health and Safety Act 2011; Work Health and Safety Regulation 2025
HRCW fall trigger: Risk of a fall of more than 2 metres.
Use the 2025 Regulation. Identify all applicable high-risk construction activities; account for site conditions and the principal contractor’s plan.
Construction projects costing $250,000 or more require a principal contractor WHS management plan.
Notify the regulator immediately of a locally notifiable death, serious injury/illness or dangerous incident; do not await this form or an investigation. Preserve the site subject to lawful rescue/safety exceptions. Give written notice within 48 hours if requested and retain notification records at least 5 years. Record decision, time, reference and site-preservation arrangements.
- Submit worker, PCBU, process/location and health-provider information as soon as practicable and within 28 days. The resubmission exception concerns worker information already supplied for the same PCBU, not a blanket exemption from later processing notices. Official source ↗
- NSW written lead-risk notification is due within 7 days of determining the work, not 14 days. Official source ↗
- Suspended, cantilevered, spur and hung scaffolds attract handover/inspection duties at any height; other scaffolds use the over-4 m trigger. This is separate from high-risk-work licensing. Official source ↗
- CSS risk assessment includes the half-exposure-standard test and must not rely on dust controls, administration or PPE to classify processing as lower risk. Training extends to exposed workers and health monitoring covers all high-risk processors. Official source ↗
- Verify notification triggers, appropriate demolition licence, named supervisor, approved worker training and retained evidence; generic construction induction is insufficient. Official source ↗
- Verify role-specific public-road traffic-control cards and work recency; construction induction also has a two-year inactivity retraining rule and a limited interim certification period. Official source ↗
- Legal standard editions and their limited scope have been checked against the full NSW text. Licensed clauses, some publisher metadata and specialist application remain unverified. Official source ↗
A fall threshold triggers the SWMS duty; it is not a “safe below this height” limit. Other high-risk work categories can trigger the duty at any height.
What the document structure covers
- High-risk construction workPage 1 records every applicable HRCW category and the actual task.
- Hazards and risksWork-step tables identify hazards and the injury or illness they could cause.
- Specific controlsEditable control cells describe actions; site fields record the actual limits, equipment and arrangements.
- Implementation, monitoring and reviewEach step has an owner and check point, with stop/restart and job review records.
- Workplace and other contractorsSite details, interfaces, permits and the principal contractor’s plan are recorded.
- Consultation and understandingWorker / HSR consultation, briefing and sign-on records are provided.
- Access and retentionRecord location and responsible person are entered; retain required versions.
The job fields support these requirements. Blank fields, unchecked controls or a signature alone do not satisfy the duties.
All jurisdictions checked
| Jurisdiction | Framework | Fall trigger / key difference | Official source |
|---|---|---|---|
| NSW New South Wales | Work Health and Safety Act 2011; Work Health and Safety Regulation 2025 | Risk of a fall of more than 2 metres | SafeWork NSW ↗ |
| VIC Victoria | Occupational Health and Safety Act 2004; Occupational Health and Safety Regulations 2017 | Risk of a fall of more than 2 metres | WorkSafe Victoria ↗ |
| QLD Queensland | Work Health and Safety Act 2011; Work Health and Safety Regulation 2011 | Risk of a fall of more than 2 metres | Workplace Health and Safety Queensland ↗ |
| WA Western Australia | Work Health and Safety Act 2020; Work Health and Safety (General) Regulations 2022 | Risk of a fall of more than 2 metres | WorkSafe WA ↗ |
| SA South Australia | Work Health and Safety Act 2012; Work Health and Safety Regulations 2012 | Risk of a fall of more than 2 metres — since 1 July 2026 | SafeWork SA ↗ |
| TAS Tasmania | Work Health and Safety Act 2012; Work Health and Safety Regulations 2022 | Risk of a fall of more than 2 metres | WorkSafe Tasmania ↗ |
| ACT Australian Capital Territory | Work Health and Safety Act 2011; Work Health and Safety Regulation 2011 | Risk of a fall of more than 2 metres | WorkSafe ACT ↗ |
| NT Northern Territory | Work Health and Safety (National Uniform Legislation) Act 2011; Regulations 2011 | More than 2 metres; more than 3 metres for residential construction from 17 July 2026 | NT WorkSafe ↗ |
| CTH Commonwealth / Comcare | Work Health and Safety Act 2011; Work Health and Safety Regulations 2011 (Commonwealth) | Risk of a fall of more than 2 metres | Comcare ↗ |
High-risk construction work checklist
Use the precise local definition. Victoria lists 19 categories, including demolition more broadly and tunnels separately; the list below follows the selected framework.
- Fall above the local HRCW threshold
- Telecommunication tower
- Load-bearing / structural demolition
- Asbestos disturbance
- Structural alteration needing temporary support
- In or near a confined space
- In or near a shaft / trench deeper than 1.5 m, or a tunnel
- Explosives
- Pressurised gas mains / piping
- Chemical, fuel or refrigerant lines
- Energised electrical installations / services
- Contaminated or flammable atmosphere
- Tilt-up or precast concrete
- Live road, railway, shipping lane or other traffic corridor
- Movement of powered mobile plant
- Artificial extremes of temperature
- Water / liquids with drowning risk
- Diving
Task-specific checks still matter
Some documents need much more than the general SWMS fields. The catalogue review register links each document to its work family and records its individual findings, corrections, sources and required job inputs.
- Silica: assess the actual material and process; complete the required silica risk plan or Victorian hazard control statement. A SWMS can only stand in for another required plan where the applicable rules allow it and all required content is included. ACT training duties also need checking.
- Asbestos, lead and contaminated materials: identification, licensed work, notification, exposure and waste rules need specialist review.
- Crane, hoist, scaffolding and precast work: confirm the licence class, plant registration, engineering design, inspections, lifting plans and rescue arrangements.
- Excavation and confined spaces: identify services, ground support, access, entry permits, atmospheric risks and a workable rescue plan.
- Traffic, electrical, gas and plumbing: trade licences, road-authority permissions, isolation and local service rules are separate requirements.
- Forms and registers: make actual records. An empty document is not an inspection, completed follow-up action or proof of training.